52 Hanover St
VRAP

52 Hanover Street

Completed a supplemental Phase II ESA to evaluate the level and extent of volatile organic compounds (VOCs) below the building slab.

82 Hanover St
VRAP

82 Hanover Street

Obtained a VRAP and NAA for the site. Submittal included an SMP, sub-slab vapor mitigation, removal and off-site disposal of accumulated material within floor drains and in-place closure of a subsurface oil storage tank location.

Why Work With Us?

Acorn’s low overhead cost, competitive rates, and principal’s direct involvement in all aspects of the project provide us with a competitive advantage over larger firms whose overhead cost is higher.