Urban Infill
Urban Infill
667 Congress Street
The Hiawatha is Portland’s newest apartment building located in the heart of Longfellow Square introducing 139 units into the housing market.
Urban Infill
40 Free Street
Located on Congress Street Historic District, Pedestrian Activities District, and the Downtown Entertainment Overlay zone, the design for this 6-story mixed use building will have 5 retail units and 51 residential units.
VRAP
VRAP
52 Hanover Street
Completed a supplemental Phase II ESA to evaluate the level and extent of volatile organic compounds (VOCs) below the building slab.
VRAP
82 Hanover Street
Obtained a VRAP and NAA for the site. Submittal included an SMP, sub-slab vapor mitigation, removal and off-site disposal of accumulated material within floor drains and in-place closure of a subsurface oil storage tank location.
Stream Restoration
Stream Restoration
Phillips Brook, Scarborough Laydown Yard
The projects primary objective is to reestablish the historical floodplain which has been lost due to encroaching fill from the nearby laydown yard and additional erosion and stream incising.
Road Construction
Road Construction
New Gloucester
Maine DOT road construction project at Intersection Rt4/100/202 at Rt. 231 & Intersection Rt4/100/202 at Bennett Rd – Acorn Engineering as Resident Construction Administration.